Author:
Pewdum Wichan,Rujirayanyong Thammasak,Sooksatra Vanee
Subject
General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering
Reference20 articles.
1. Defining Cost/Schedule Performance Indices and Their Ranges for Design Projects
2. Christensen, D.S. (1992), “Determining an accuracy estimate at completion”,National Contract Management Journal, Vol. 25 No. 1, pp. 17‐25.
3. Project Advocacy and the Estimate at Completion Problem
4. Knowledge-based approach to construction project control
5. Eldin, N.N. and Hughes, R.K. (1992), “An algorithm for tracking labor cost”,Journal of Cost Engineering, Vol. 34 No. 4, pp. 17‐23.
Cited by
46 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献