Barriers to implementing reverse logistics in South Australian construction organisations

Author:

Chileshe Nicholas,Rameezdeen Raufdeen,Hosseini M. Reza,Lehmann Steffen

Abstract

Purpose – This paper aims to present a survey of the perceptions of the barriers to implementing reverse logistics (RL) practices in South Australian (SA) construction organisations. Despite the extensive research on forward logistics and RL, there is a paucity of studies that examine the barriers to implementing RL particularly within the Australian construction industry. This study builds on the ongoing research being undertaken by the authors, entitled “Designing for reverse logistics (DfRL) within the building life cycle: practices, drivers and barriers”, which is examining the best practices and drivers that could be used as a “road map” for developing appropriate solutions for the successful implementation of RL. Design/methodology/approach – Data were collected by utilising a triangulated data collection approach, a literature review and 49 questionnaires. The review of the literature identified 16 barriers to implementing RL. The quantitative survey data were subjected to descriptive and inferential statistics with correlation analysis to examine the relationships between different pairs of variables comprising RL’s critical barriers. Findings – The following barriers were indicated as most significant: lack of incorporation of salvaged materials by designers; regulation restrictions to usage of recovered materials and components; potential legal liabilities; higher costs; and longer-time association with deconstructing buildings. The least ranked barriers were mostly drawn from the operational and industrial categories as being: organisational lack of support for deconstruction due to incompatible design; lack of organisational support for deconstructing buildings due to higher health and safety risks; and inadequate skills and experience for deconstruction (operational). The industrial barrier was related to “higher costs of salvaged materials in comparison to virgin products”. Research limitations/implications – First, the reported findings are focussed on one study that used questionnaire surveys within the construction industry; therefore, the results may not be generalisable to other contexts. Further, studies should be conducted and extended to other industrial sectors beyond the construction industry. Second, the quantitative study (n = 49) used a smaller sample, and the survey items were based on the review of the literature. Practical implications – The identified barriers could be used as a “road map” for the development of appropriate solutions for the successful implementation of RL, and to improve the environment-related decision-making processes of contractors. Originality/value – This study makes a contribution to the body of knowledge on the subject of RL within a previously unexplored SA context. In addition, the study provides some insights on the contributory effects of the barriers to the implementation of RL. It is the first work undertaken to determine the barriers to the adoption of RL within the SA construction industry.

Publisher

Emerald

Subject

General Business, Management and Accounting

Reference143 articles.

1. Abdulrahman, M.D. , Gunasekaran, A. and Subramanian, N. (2014), “Critical barriers in implementing reverse logistics in the Chinese manufacturing sectors”, International Journal of Production Economics , Vol. 147, pp. 460-471.

2. Addis, W. (2006a), “Making reclamation, reuse and recycling happen”, in Addis, W. (Ed.), Building with Reclaimed Components and Materials: A Design Handbook for Reuse and Recycling , Earthscan, London.

3. Addis, W. (2006b), “The world of reclamation, reuse and recycling”, in Addis, W. (Ed.), Building with Reclaimed Components and Materials: A Design Handbook for Reuse and Recycling , Earthscan, London.

4. Ahmed, S. and Hassan, M. (2003), “Survey and case investigations on applications of quality management tools and techniques in SMIs”, International Journal of Quality & Reliability Management , Vol. 20 No. 7, pp. 795-826.

5. Aidonis, D. , Xanthopoulos, A. , Vlachos, D. and Iakovou, E. (2008), “An analytical methodological framework for managing reverse supply chains in the construction industry”, World Scientific and Engineering Academy and Society (WSEAS)Transactions on Environment and Development , Vol. 4, pp. 1036-1046.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3