Design morphology complexity and conceptual building project cost forecasting

Author:

Kantianis Dimitrios D.

Abstract

Purpose This research aims to develop conceptual phase building project cost forecasting models by exploring the relationship of existing plan shape complexity indices and general design morphology parameters with total construction cost. Design/methodology/approach Plan shape indices proposed to date by the literature for measuring building design complexity are critically reviewed. Building morphology is also dictated by town planning restrictions such as plot coverage ratio or number of storeys. This study analyses historical data collected from 49 residential building projects to develop multiple linear regression (MLR) and artificial neural network (ANN) models for forecasting construction cost. Existing plan shape coefficients are calculated to evaluate the geometrical complexity of sampled projects. Ten regression-based cost estimating equations are totally derived from stepwise backward and forward methods, and their predictive accuracy is contrasted: to performance levels reported in past studies and to ANN models developed in this research with multilayer perceptron architecture. Findings Analysis of plan shape indices revealed that 85.7% of examined past projects possess a high degree of design complexity, hence resulting in expensive initial decisions. This highlights the need for more effective early design stage decision-making by developing new building economic tools. The most accurate regression model, with a mean absolute percentage error (MAPE) of 19.2%, predicts the log of total cost from wall to floor index and total building envelope surface. Other explanatory variables resulting in MAPE values in the order of 20%–22% are total volume, volume above ground level, gross floor area below ground level, gross floor area per storey and total number of storeys. The overall MAPE of regression-based equations is 24.3% whilst ANN models are slightly more accurate with MAPE scores of 21.8% and 21.6% for one hidden and two hidden layers, respectively. The most accurate forecasting model in the research is the ANN with two hidden layers and the sigmoid activation function which predicts total building cost from total building volume (19.1%). Originality/value This paper introduces MLR-based and ANN-based conceptual construction cost forecasting models which are founded solely on building morphology design parameters and compare favourably with previous studies with an average predictive accuracy less than 25%. This paper is expected to be beneficial to both practitioners and academics in the built environment towards more effective cost planning of building projects. The methodology suggested can further be implemented in other countries provided that accurate and relevant data from historical projects are used.

Publisher

Emerald

Subject

Economics and Econometrics,Finance,Accounting,Business and International Management,Building and Construction

Reference44 articles.

1. Regularization neural network for construction cost estimation;Journal of Construction Engineering and Management,1998

2. The accuracy of pre-tender building cost estimates in Australia;Construction Management and Economics,2008

3. Modelling the relationship of architectural and structural design variables for estimating substructure cost of duplexes;Civil and Environmental Research,2015

4. Analysis of factors influencing project cost estimating practice;Construction Management and Economics,2000

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3