4P delays in project management

Author:

Ansah Richard Hannis,Sorooshian Shahryar

Abstract

Purpose As a result of the increasing challenges of time overrun, several companies regularly set up delay assessment procedures for performance improvement and profit maximization. In the construction industry, projects are enormously complicated and involve significant budgets, and therefore optimizing project performance through the root cause analysis should be imperative for every project manager. Typically issues of delays in projects are generally discussed and problematized separately, yet a comprehensive framework for systematic analysis and grouping of delays is rarely contended. The purpose of this paper is to introduce the 4P concept (project related, practices, participants, and procurement) for identifying, analyzing, and classifying delays in the internal environment of the project development process. Design/methodology/approach The 4P conceptual framework was validated through the synthesis of the existing literature. Findings Interestingly, despite the increasing concerns about delays in the construction industry, most research on delays are project and/or country specific, thus no consensus about the sources of delays. The application of the proposed concept as a theoretical framework would provide an understanding of the available delay sources, their risks and use for project delay assessment and classification. Research limitations/implications This study grouped delays based on the shared characteristics and four main sources were identified and analyzed. There may be other sources or factors, yet would be dependent or aspect of the 4P. Practical implications The study informs project teams to reduce delays in the construction industry. Originality/value The paper is an application of risk assessment tool to conceptualize delays in the internal project environment.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference78 articles.

1. Causes of delay in building construction projects in Egypt;Journal of Construction Engineering and Management,2008

2. The self-destruction and renewal of lean construction theory: a prediction from Boyd’s theory,2004

3. Contractor perspective on time overrun factors in Malaysian construction projects;International Journal of Science, Environment and Technology,2014

4. Identification and evaluation of factors influencing variations on building projects;International Journal of Project Management,1997

Cited by 22 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3