Author:
Tran Dai Q.,Nguyen Long Duy,Faught Allen
Abstract
Purpose
Design-Build (D-B) is a project delivery method in which the owner procures both design and construction services in the same contract from a single legal entity. There is limited research on how communication among parties influences the success of D-B projects. The purpose of this paper is to examine D-B communication issues and provides effective practices on communication to improve D-B procurement processes in the USA.
Design/methodology/approach
The research methodology for this study includes a comprehensive review of literature, survey questionnaire, and structured interviews. A questionnaire was developed to collect data from professionals with an average of 23 years of experience related to D-B procurement. Eight structured interviews were conducted to verify and validate the survey questionnaire results.
Findings
The results showed that the communication issues vary along with each phase of the D-B process. The primary communication practices influencing the success of D-B projects are: establishing clear points of contact; providing clear and understandable information among stakeholders during the D-B process; and the timely sharing of information to all stakeholders.
Research limitations/implications
The chief limitation of this research is that the primary data were mostly opinions from experts although several empirical data were collected for cross-validation. This research did not consider the relationship of relevant contract clauses and communication issues.
Practical implications
The findings from this paper will help professionals better understand the D-B procurement process.
Originality/value
This is one of the first attempts to discuss D-B communication issues in each different phase of a D-B project.
Subject
General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering
Reference36 articles.
1. Primer on project delivery;American Institute of Architects/Associated General Contractors of America (AIA/AGC),2011
2. Determinants of construction project success;Project Management Journal,1987
3. Managing projects with distributed and embedded knowledge through interactions;International Journal of Project Management,2014
4. Contract strategy for design management in the design and build system;International Journal of Project Management,2005
Cited by
21 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献