Construction project productivity evaluation framework with expanded system boundaries

Author:

Zhan WentingORCID,Pan Wei,Chen LeORCID

Abstract

PurposeWhile the investment in construction projects has increased over the past few decades, low construction project productivity (CPP) appeared to be persistent, thereby reflecting an “investment-in-failure” paradox between the investment and CPP. Hence, this paper aims to develop a systematic and holistic CPP evaluation framework to explain the apparent paradox in the construction industry.Design/methodology/approachThe paper first reviews the literature about the theories of system, production, principal–agent and project success evaluation to re-conceptualise the CPP and proposes a two-stage CPP evaluation framework. The framework is subsequently explored through a sequential qualitative mixed-methods design within the context of the Hong Kong construction industry by combining 32 semi-structured interviews with senior industry experts and exploratory case studies, with three real-life construction projects.FindingsThe paper identifies three system boundaries for CPP evaluation, that is, parameter, timeframe and stakeholder, and develops a two-stage CPP evaluation framework to indicate site efficiency and utilisation effectiveness, thereby accessing the productivity of both the construction and post-construction stages. The “investment-in-failure” paradox associated with current CPP evaluation approaches is primarily attributed to the narrowly defined CPP boundaries.Research limitations/implicationsThe qualitative exploration of the evaluation framework only focusses on the Hong Kong construction industry. Further case studies within other urban contexts could be used to improve the generalisability of the findings. Quantitative research is also necessary to advance theoretical development of the two-stage CPP evaluation.Practical implicationsThe systemic CPP conceptualisation and the two-stage CPP evaluation framework support the systems thinking of industry stakeholders and enable them to formulate holistic strategies for long-term CPP enhancement.Originality/valueThe research demonstrates the needs to expand the system boundaries of CPP to reflect its systemic value and to shift the paradigm of CPP evaluation from being output-orientated and quantity-focussed to being outcome-orientated and value-focussed.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Cited by 7 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Performance Measurement Criteria: Conceptual Framework for Subcontracting Management in the Malaysian Construction Supply Chain;Green Infrastructure;2023

2. Project Successful Deployment;International Journal of Online and Biomedical Engineering (iJOE);2022-11-22

3. Productivity Measurement and Improvement for Public Construction Projects;Journal of Construction Engineering and Management;2022-06

4. Construction productivity prediction through Bayesian networks for building projects: case from Vietnam;Engineering, Construction and Architectural Management;2022-02-15

5. A scientometric analysis and review of construction labour productivity research;International Journal of Productivity and Performance Management;2022-02-11

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3