Construction productivity prediction through Bayesian networks for building projects: case from Vietnam

Author:

Khanh Ha DuyORCID,Kim Soo Yong,Linh Le Quoc

Abstract

Purpose This study aims to focus on exploring the construction productivity of building projects under the influence of potential factors. The three primary purposes are (1) determining critical factors affecting construction productivity; (2) identifying causal relationship and occurrence probability of these factors to develop a Bayesian network (BN) model; and (3) validating the accuracy of predictions from the proposed BN model via a case study. Design/methodology/approach A conceptual framework that includes three performance stages was used. Twenty-two possible factors were screened from a comprehensive literature review and evaluated through expert opinions. Data were collected using a structured questionnaire-based survey and case-study-based survey. The sampling methods were based on non-probability sampling. Findings Worker characteristic-related factors significantly affect labour productivity for a construction task. Construction productivity is dominated by the working frequency of workers (overtime), complexity of the task, level of technology application and accidents. Labour productivity is defined as nearly 50% of the baseline productivity using the BN model created by the caut 2sal relationship and probability of factors. The prediction error of the BN model was 6.6%, 10.0% and 9.3% for formwork (m2/h), reinforcing steel (ton/h) and concrete (m3/h), respectively. Research limitations/implications The evaluation or prediction of productivity performance has become a necessary topic for research and practice. Practical implications Managers and practitioners in the construction sector can utilise the outcome of this study to create good productivity management policies for their prospective projects. Originality/value Worker-related characteristics are dominant among critical factors affecting labour productivity for a construction task; the proposed BN-based predictive model is built based on these critical factors. The BN approach is highly accurate for construction productivity prediction. The findings of this study can fill gaps in the construction management body of knowledge when modelling construction productivity under the effects of multiple factors and using a simple probabilistic graphic tool.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference94 articles.

1. Impact of poor labor productivity on construction project cost;International Journal of Construction Management,2020

2. Financial-related causes contributing to project delays;Journal Retail Leisure Property,2009

3. Analysis of construction-related factors affecting the efficiency construction labour;Journal of Construction Project Management and Innovation,2015

4. Labour productivity statistics: a reality check for the Norwegian construction industry;International Journal of Construction Management,2020

5. Analyzing construction site accidents in Kuwait;Kuwait Journal of Science and Engineering,2002

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3