Optimized resource-constrained method for project schedule compression

Author:

Elkabalawy Moaaz,Moselhi Osama

Abstract

PurposeThis paper aims to present an integrated method for optimized project duration and costs, considering the size and cost of crews assigned to project activities' execution modes.Design/methodology/approachThe proposed method utilizes fuzzy set theory (FSs) for modeling uncertainties associated with activities' duration and cost and genetic algorithm (GA) for optimizing project schedule. The method has four main modules that support two optimization methods: modeling uncertainty and defuzzification module; scheduling module; cost calculations module; and decision-support module. The first optimization method uses the elitist non-dominated sorting genetic algorithm (NSGA-II), while the second uses a dynamic weighted optimization genetic algorithm. The developed scheduling and optimization methods are coded in python as a stand-alone automated computerized tool to facilitate the developed method's application.FindingsThe developed method is applied to a numerical example to demonstrate its use and illustrate its capabilities. The method was validated using a multi-layered comparative analysis that involves performance evaluation, statistical comparisons and stability evaluation. Results indicated that NSGA-II outperformed the weighted optimization method, resulting in a better global optimum solution, which avoided local minima entrapment. Moreover, the developed method was constructed under a deterministic scenario to evaluate its performance in finding optimal solutions against the previously developed literature methods. Results showed the developed method's superiority in finding a better optimal set of solutions in a reasonable processing time.Originality/valueThe novelty of the proposed method lies in its capacity to consider resource planning and project scheduling under uncertainty simultaneously while accounting for activity splitting.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference38 articles.

1. An optimization-based methodology for the definition of amplitude thresholds of the ground penetrating radar;Soft Computing,2019

2. An extensive machine learning-based comparative analysis for mimicking loss of productivity as a result of change orders;Journal of Scientific and Engineering Research,2020

3. A mixed-integer linear programming model for solving fuzzy stochastic resource constrained project scheduling problem;Operational Research,2017

4. A resource constrained project scheduling problem with multi-modes;International Journal of Information Technology Project Management,2020

5. Discrete particle swarm optimization method for the large-scale discrete time–cost trade-off problem;Expert Systems with Applications,2016

Cited by 4 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3