Identifying focus areas to decode the decision to litigate contractual disputes in construction

Author:

Jagannathan MuraliORCID,Delhi Venkata Santosh Kumar

Abstract

PurposeStrong and independent judiciary symbolizes transparency and impartiality in the dispute resolution process. However, litigation is often time-consuming and affects the working relationship between the disputants. In the construction context, where projects typically have a short life span of three to four years, dispute resolution through litigation induces unaffordable process delays. Despite the inherent challenges associated with litigation, it is observed that disputing parties resort to litigation. This behavior, called the litigation dilemma, ostensibly appears counterintuitive to rational decision-making.Design/methodology/approachThe study identifies 35 “decision to litigate” (DTL)-triggers from a review of the literature and court cases followed by expert interviews and groups them into thematic research domains using Exploratory Factor Analysis (EFA) followed by Confirmatory Factor Analysis (CFA).FindingsDTL studies in construction stands benefited through interdisciplinary research. “Presumptuous decision-making,” “construction project characteristics,” “milieu influence,” “interest in amicable resolution,” “positional focus” and “opportunism” are the six focus areas to decode the DTL in construction.Research limitations/implicationsThe study identifies factors that consolidate the knowledge from various fields with the substantive experience of construction professionals from across the world to help understand the dynamics behind the DTL in the context of contract-linked disputes in construction.Originality/valueThe findings from the domains of law, behavior, sociology and economics can help understand the above dilemma in the context of contractual disputes in construction. However, studies that explore the “decision to litigate” (DTL) contractual disputes in construction are limited, providing a vast scope for further research. The current study addresses a part of this gap.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference124 articles.

1. Models for the administration of structured construction contract notices;Journal of Legal Affairs and Dispute Resolution in Engineering and Construction,2017

2. Effectiveness of arbitration in contractual disputes: tension between procedural efficiency and award quality;Journal of Legal Affairs and Dispute Resolution in Engineering and Construction,2019

3. Scottish construction lawyers and mediation: an investigation into attitudes and experiences;International Journal of Law in Built Environment,2011

4. Factors causing construction litigation in Saudi arabia;Journal for the Advancement of Performance Information and Value,2015

5. Financing the litigation arms race;Stanford University Graduate School of Buisness Research Paper,2020

Cited by 9 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3