Nigeria’s construction industry: barriers to effective communication

Author:

Ejohwomu Obuks Augustine,Oshodi Olalekan ShamsideenORCID,Lam Ka Chi

Abstract

Purpose Communication plays an important role in the quality of the relationship, trust and collaboration among construction project teams. Literature suggests that effective communication is vital for achieving improved project performance. The purpose of this paper is to identify and assess the barriers to effective communication in the Nigerian construction industry, using attribution theory paradigm. Design/methodology/approach Questionnaires detailing 15 barriers to effective communication were administered to consultants and contractors engaged in the Nigerian construction sector. In total, 100 valid responses were analysed using mean score, factor analysis and factor score. Findings Unclear project objectives, ineffective reporting systems and poor leadership were ranked as the most significant barriers to effective communication. Factor analysis uncovered that the principal reasons responsible for ineffective communication include: managerial and technical barriers and credibility and background barriers. Practical implications The results provide information on barriers which needs to be addressed in order to improve communication in construction projects in Nigeria. There is a need to conduct post-completion reviews of construction projects so that project team members can learn and share knowledge on past experiences. Although the present study was conducted in the Nigerian context, it is envisaged that the research outcome will be widely applicable to other developing countries. Originality/value The study provides insights on the perceived barriers to effective communication in Nigerian construction projects. The paper presents the direction for further research aimed at improving communication in construction projects in Nigeria.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference81 articles.

1. Causes of delay in building construction projects in Egypt;Journal of Construction Engineering and Management,2008

2. Affare, M.A.W. (2012), “An assessment of project communication management on construction projects in Ghana”, unpublished master’s thesis, Kwame Nkrumah University of Science and Technology, Kumasi.

3. Construction delays and their causative factors in Nigeria;Journal of Construction Engineering and Management,2006

4. Residential building stakeholders’ attitudes and beliefs regarding nail gun injury risks and prevention;New Solutions: a Journal of Environmental and Occupational Health Policy,2014

5. Need for alternative research approaches in construction management: case of delay studies;Journal of Management in Engineering,2013

Cited by 33 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3