Abstract
Purpose
Communication plays an important role in the quality of the relationship, trust and collaboration among construction project teams. Literature suggests that effective communication is vital for achieving improved project performance. The purpose of this paper is to identify and assess the barriers to effective communication in the Nigerian construction industry, using attribution theory paradigm.
Design/methodology/approach
Questionnaires detailing 15 barriers to effective communication were administered to consultants and contractors engaged in the Nigerian construction sector. In total, 100 valid responses were analysed using mean score, factor analysis and factor score.
Findings
Unclear project objectives, ineffective reporting systems and poor leadership were ranked as the most significant barriers to effective communication. Factor analysis uncovered that the principal reasons responsible for ineffective communication include: managerial and technical barriers and credibility and background barriers.
Practical implications
The results provide information on barriers which needs to be addressed in order to improve communication in construction projects in Nigeria. There is a need to conduct post-completion reviews of construction projects so that project team members can learn and share knowledge on past experiences. Although the present study was conducted in the Nigerian context, it is envisaged that the research outcome will be widely applicable to other developing countries.
Originality/value
The study provides insights on the perceived barriers to effective communication in Nigerian construction projects. The paper presents the direction for further research aimed at improving communication in construction projects in Nigeria.
Subject
General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering
Reference81 articles.
1. Causes of delay in building construction projects in Egypt;Journal of Construction Engineering and Management,2008
2. Affare, M.A.W. (2012), “An assessment of project communication management on construction projects in Ghana”, unpublished master’s thesis, Kwame Nkrumah University of Science and Technology, Kumasi.
3. Construction delays and their causative factors in Nigeria;Journal of Construction Engineering and Management,2006
4. Residential building stakeholders’ attitudes and beliefs regarding nail gun injury risks and prevention;New Solutions: a Journal of Environmental and Occupational Health Policy,2014
5. Need for alternative research approaches in construction management: case of delay studies;Journal of Management in Engineering,2013
Cited by
33 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献