Stability and accuracy of deterministic project duration forecasting methods in earned value management

Author:

Barrientos-Orellana AlexisORCID,Ballesteros-Pérez PabloORCID,Mora-Melia DanielORCID,González-Cruz Maria Carmen,Vanhoucke Mario

Abstract

PurposeEarned Value Management (EVM) is a project monitoring and control technique that enables the forecasting of a project's duration. Many EVM metrics and project duration forecasting methods have been proposed. However, very few studies have compared their accuracy and stability.Design/methodology/approachThis paper presents an exhaustive stability and accuracy analysis of 27 deterministic EVM project duration forecasting methods. Stability is measured via Pearson's, Spearman's and Kendall's correlation coefficients while accuracy is measured by Mean Squared and Mean Absolute Percentage Errors. These parameters are determined at ten percentile intervals to track a given project's progress across 4,100 artificial project networks with varied topologies.FindingsFindings support that stability and accuracy are inversely correlated for most forecasting methods, and also suggest that both significantly worsen as project networks become increasingly parallel. However, the AT + PD-ESmin forecasting method stands out as being the most accurate and reliable.Practical implicationsImplications of this study will allow construction project managers to resort to the simplest, most accurate and most stable EVM metrics when forecasting project duration. They will also be able to anticipate how the project topology (i.e., the network of activity predecessors) and the stage of project progress can condition their accuracy and stability.Originality/valueUnlike previous research comparing EVM forecasting methods, this one includes all deterministic methods (classical and recent alike) and measures their performance in accordance with several parameters. Activity durations and costs are also modelled akin to those of construction projects.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Cited by 11 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Enhanced ESM approach for duration forecasting in delayed projects;Ain Shams Engineering Journal;2024-03

2. Improving Project Estimates at Completion through Progress-Based Performance Factors;Buildings;2024-02-29

3. Intelligent Control Method for Airport Road Construction Project Progress Based on BIM;2024 3rd International Conference on Energy and Power Engineering, Control Engineering (EPECE);2024-02-23

4. Selecting EVM, ESM and EDM(t) for managing construction project schedule;Engineering, Construction and Architectural Management;2023-06-16

5. Explainable machine learning for project management control;Computers & Industrial Engineering;2023-06

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3