Development of a risk assessment model for adopting public–private partnership in building Ghana’s critical infrastructure resilience against unexpected events

Author:

Ampratwum GodsloveORCID,Osei-Kyei RobertORCID,Tam Vivian W.Y.ORCID

Abstract

PurposeCritical infrastructures are susceptible to unexpected disruptive events that affect their functional performance. Public–private partnership (PPP) offers opportunities for stakeholders to build resilience by proactively coordinating and positioning the capabilities of the stakeholders. Partnerships are mostly riddled with risks that affect the performance and goal attainment of the partnerships. The purpose of this study was to develop a risk assessment model for PPP in critical infrastructure resilience (CIR) using fuzzy synthetic evaluation.Design/methodology/approachThis study used a quantitative approach to analyse survey responses from respondents. Mean score ranking, Kendall’s coefficient of concordance and fuzzy synthetic evaluation were used to analyse the responses from respondents.FindingsThis study identified seven risk categories; Political, Financial, Ethical, Bureaucracies and red tapes, Legal, Coordination and Institutional as the critical risk categories that may frustrate the partners in a PPP arrangement from performing their responsibilities. A risk assessment model was also developed in the form of a risk index equation to ascertain the risk level of using a PPP to build critical infrastructure resilience in Ghana. It was found that the risk level in using PPP to build critical infrastructure resilience is high.Practical implicationsThe outcome of this study can be used as an informative and guiding tool to streamline any future PPP arrangement or even amend current PPP arrangements in critical infrastructure resilience.Originality/valueThe study has drawn attention to the risks in using PPP to build critical infrastructure resilience within the Ghanaian context. It has also established a risk index to assess the risk level of using PPP to build critical infrastructure resilience. This risk index can be used to ascertain the risk level in different countries. In addition, no research has been conducted to empirically test the risks in using PPP to build critical infrastructure resilience thus making this study a novel contribution to the critical infrastructure resilience research domain.

Publisher

Emerald

Reference79 articles.

1. A fuzzy synthetic evaluation of the challenges of smart city development in developing countries;Smart and Sustainable Built Environment,2020

2. Accounting for disasters: evidence of under-representation of victims in the accountability process;Journal of Accounting in Emerging Economies,2019

3. Risk assessment framework of PPP-megaprojects focusing on risk interaction and project success;Transportation Research Part A: Policy and Practice,2019

4. A holistic review of research studies on financial risk management in public–private partnership projects;Engineering, Construction and Architectural Management,2020

5. Ameyaw, E.E. (2015), “Risk Allocation model for public-private partnerhsip water supply projects in Ghana”, (Publication Number The Hong Kong Polytechnic University), available at: https://theses.lib.polyu.edu.hk/handle/200/7867 (accessed 12 May 2023).

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3