Abstract
PurposeIndustries generally require good maintenance, repair and overhaul (MRO) facilities. Maintenance activities at MRO cover the normal scheduled check-ups known as scheduled preventive maintenance (SPM) whereas an overhaul reviews and rejuvenates the complete system at a scheduled time. The literature is reasonably stocked with reliability modelling of repairable systems considering both the corrective maintenance (CM) and SPM as imperfect. However, in all these situations the overhaul is modelled as perfect repair. Thus, the purpose of this research paper is to develop a mathematical model for the estimation of reliability parameters considering the complete MRO as imperfect.Design/methodology/approachThe paper proposes arithmetic reduction of age (Kijima I) based virtual age model to estimate reliability parameters by considering the complete MRO as imperfect and provides the likelihood and log-likelihood functions for parameter estimation of the proposed model and also presents the various extensions of the proposed model.FindingsFor analysis, two real-time data sets of two components, i.e. turbostarter and plunger pump are considered. The analysis mainly focuses on intensity function and availability of components. The availability analysis of the components directly affects the cost analysis. It is very important to analyze the realistic trend of availability, and the comparative analysis shows that the assumption of perfect overhaul overestimates and minimal overhaul underestimates the performance of the components whereas assumption of imperfect overhaul portraits more sensible deteriorating and availability trend of the components.Originality/valueThe proposed methodology in this paper is a novice and not available in the literature.
Subject
Strategy and Management,General Business, Management and Accounting
Reference33 articles.
1. Risk factors for musculoskeletal injuries in airline maintenance, repair and overhaul;International Journal of Industrial Ergonomics,2019
2. On innovative stochastic renewal process models for exact unavailability quantification of highly reliable systems,2017
3. Optimal overhaul intervals with imperfect inspection and repair;IMA Journal of Management Mathematics,1998
4. A competing risk model for dependent and imperfect condition–based preventive and corrective maintenances,2014
5. System performance-based joint importance analysis guided maintenance for repairable systems;Reliability Engineering and System Safety,2019
Cited by
8 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献