1. Unit costs of infrastructure projects in Sub-Saharan Africa;African Infrastructure Country Diagnostic (AICD),2008
2. Akoa, B.B. (2011), “Cost overruns and time delays in highway and bridge projects in developing countries-experiences from Cameroon”, An unpublished Master’s thesis submitted to Michigan State University.
3. Understanding major causes cost overrun for infrastructure projects; a typology approach,2013
4. Accuracy in estimating project cost construction contingency – a statistical analysis,2004
5. An Analysis of Cost Overruns and Time Delays of INDOT Projects,2004