Author:
Deep Shumank,Bhoola Vanita,Verma Saumya,Ranasinghe Udara
Abstract
Purpose
Construction projects in the real estate sector are important for a nation’s economic growth. However, owing to several constraints and stereotypes, the construction industry is suffering from major capital losses. A review of recent literature revealed that risks occurring in real estate construction projects (RECPs) carried out in developing economies can be divided into four categories, i.e. financial risks, design risks, execution risks and sociopolitical risks. This study aims to identify the critical factors that lead to these risk categories and develop a control structure for RECPs.
Design/methodology/approach
A quantitative method, i.e. a questionnaire-based survey, was used for this study. Using a random sampling technique the questionnaire was distributed to selected, highly experienced project managers. To determine whether the factors identified as part of the literature review strongly influence the categories, the factor analysis of the observations was performed.
Findings
The observations made in this study lead to the identification of six critical risk causing factors, i.e. lack of efficient planning, execution constraints, external constraints, client-induced constraints, project constraints and partner experience. The observations indicated a lack of knowledge of project management, organizational culture and a claims redressal mechanism in RECPs. Also, this study recommends a blockchain-based control structure to control the occurrence of the risk causing factors identified.
Originality/value
This study recommends a blockchain-based control structure for controlling the risks occurring.
Subject
Economics and Econometrics,Finance,Accounting,Business and International Management
Reference110 articles.
1. An empirical analysis of organizational external factors on construction risk management;Int J Suppl Chain Manag,2019
2. Conditional volatility and correlation between stocks and REITS in BRICS countries: advice to real estate and portfolio managers,2019
3. 4P delays in project management;Engineering, Construction and Architectural Management,2018
4. Critical success factors for implementing building information modelling (BIM): a longitudinal review;Automation in Construction,2018
5. Meta review of critical risk factors in PPP projects of emerging nations in South Asia;The Journal of Developing Areas,2018
Cited by
13 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献