Abstract
This paper considers scheduling n jobs on one machine to minimize the expected weighted flowtime and the number of late jobs. The processing times of the jobs are independent random variables. The machine is subject to failure and repair where the uptimes are exponentially distributed. We find the optimal policies for the preemptive repeat model.
Publisher
Cambridge University Press (CUP)
Subject
Industrial and Manufacturing Engineering,Management Science and Operations Research,Statistics, Probability and Uncertainty,Statistics and Probability
Cited by
31 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献