Author:
Pinedo Michael,Rammouz Elias
Abstract
This paper considers a single machine and n jobs. The machine is subject to breakdown and repair. Job j has a weight wj, a random processing time Xj, and is available for processing from a random time Rj on. The jobs may be subject to precedence constraints. We are interested in optimal policies that minimize the following objective functions: (i) the weighted sum of the completion times; (ii) the weighted sum of an exponential function of the completion times; and (iii) the weighted number of late jobs having due dates.
Publisher
Cambridge University Press (CUP)
Subject
Industrial and Manufacturing Engineering,Management Science and Operations Research,Statistics, Probability and Uncertainty,Statistics and Probability
Cited by
53 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献