1. 1) Agency for Natural Resources and Energy: Preliminary Briefing on Revised FIT Act (February/March 2017), pp.9-10, 2017, https://www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/dl/kaisei/fit_2017setsumei.pdf, accessed 2022.9.29(in Japanese) 資源エネルギー庁: 改正 FIT 法に関する直前説明会(平成 29 年 2・3 月), pp.9-10, 2017, 閲覧日 2022/9/29
2. 2) Y. Okazawa, K. Hino and Y. Asami: Location factors of photovoltaic power plants in the Kyusyu Electronic Power jurisdiction, Journal of Architecture and Planning (Transactions of AIJ), Vol.85, No.774, pp.1751-1759, 2020 (in Japanese), (DOI: https://doi.org/10.3130/aija.85.1751 ) 岡澤由季, 樋野公宏, 浅見泰司: 九州電力管内における太陽光発電事業の立地要因, 日本建築学会計画系論文集, 第85 巻, 第774 号, pp.1751-1759, 2020
3. 3) Ministry of Economy, Trade and Industry: Investigative Committee on Appropriate Introduction and Management of Renewable Energy Power Generation Facilities 5th Document 2 “Main Opinions at the Investigative Committee”, p.2, 2022, https://www.meti.go.jp/shingikai/energy_environment/saisei_kano_energy/pdf/005_02_00.pdf, accessed 2022.9.29(in Japanese) 経済産業省:再生可能エネルギー発電設備の適正な導入及び管理のあり方に関する検討会第 5 回資料 2「検討会における主な意見」, p.2, 2022, 閲覧日 2022/9/29
4. 4) Ministry of Agriculture, Forestry and Fisheries: Regarding farmland diversion permission results for installing photovoltaic power generation equipment https://www.maff.go.jp/j/nousin/noukei/totiriyo/attach/pdf/einogata-4.pdf, accessed 2022.9.29 (in Japanese) 農林水産省:太陽光発電設備を設置するための農地転用許可実績について,閲覧日 2022/9/29
5. 5) V.V. Katkar, J.A. Sward, A.Worsley and K.M. Zhang: Strategic land use analysis for solar energy development in New York State, Renewable Energy, Vol.173, pp.861-875, 2021 (DOI: https://doi.org/10.1016/j.renene.2021.03.128 )