Causes of delays in construction projects in the Province of Aceh, Indonesia

Author:

Rauzana AnitaORCID,Dharma Wira

Abstract

Implementations of construction projects in Indonesia, especially in Aceh Province, are often delayed. Time, quality, and cost are three important components of planning a construction project. The benchmark for a successful construction project is the project completion time being in accordance with the time period specified in the contract. In project implementation, there is often a risk of delays in completing construction projects that can cause losses and fines; therefore, it is necessary to know the risk factors potentially causing project delays. The purpose of this study was to identify the risk factors causing delays greatly affecting construction projects in Aceh Province. The data used in this study were questionnaire data distributed to 68 respondents. The data processing methods included validity tests, reliability tests, and the construction of descriptive statistics. Ultimately, 60 delay factors were obtained; of these, 30 risk indicators were included in the very influential category with a mode value of (= 5), 29 delay risk indicators were in the high influence category with a mode value of (= 4), and one indicator was included in the category of medium influence (= 3).

Publisher

Public Library of Science (PLoS)

Subject

Multidisciplinary

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3