Evaluation of critical risk factors in the implementation of modular construction

Author:

Pervez Hamza,Ali Yousaf,Pamucar DraganORCID,Garai-Fodor Mónika,Csiszárik-Kocsir ÁgnesORCID

Abstract

Modular construction is considered as a preferred construction method over conventional construction due to a number of benefits including reduction in project completion time, improved environmental performance, better quality, enhanced workers’ safety and flexibility. However, successful implementation of modular construction is hindered by various risk factors and uncertainties. Therefore, it is imperative to perform a comprehensive risk assessment of critical risk factors that pose a negative impact on the implementation of modular construction. Moreover, there is also a relatively less rate of modular construction adoption in developing countries, highlighting the need to focus more on underdeveloped regions. This study aims to propose a risk assessment framework for identification, evaluation and prioritization of critical risk factors affecting the implementation of modular construction in Pakistan. 20 risk factors were identified from previous literature which were then evaluated to shortlist the most significant risks using Fuzzy Delphi. The most significant risk factors were then prioritized using a novel Full-Consistency Method (FUCOM). The results specified ‘Inadequate skills and experience in modular construction’, ‘Inadequate capacity of modular manufacturers’ and ‘Inability to make changes in design during the construction stage’ as top three critical risks in the implementation of modular construction. This is the first study to propose a risk assessment framework for modular construction in Pakistan. The results of the study are useful to provide insights to construction industry practitioners in highlighting and eliminating risks involved in modular construction planning and execution.

Publisher

Public Library of Science (PLoS)

Subject

Multidisciplinary

Reference120 articles.

1. Waghmare, AP. Advances in Construction: Lean Construction for Productivity enhancement and waste minimization;A Ingle;Int J Eng Appl Sci,2015

2. The next generation of sustainable construction;CJ Kibert;Build Res Inf,2007

3. Searching for an optimal level of prefabrication in construction: An analytical framework;W Lu;J Clean Prod,2018

4. Integrating off-site and on-site panelized construction schedules using fleet dispatching;SJ Ahn;Autom Constr,2022

5. Future opportunities for offsite in the UK;C Goodier;Constr Manag Econ,2007

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3