Author:
Ahn Sang Jun,Han SangUk,Altaf Mohammed Sadiq,Al-Hussein Mohamed
Subject
Building and Construction,Civil and Structural Engineering,Control and Systems Engineering
Reference25 articles.
1. Causes of delay in large construction projects;Assaf;Int. J. Proj. Manag.,2006
2. Integrated production planning and control system for A Panelized home prefabrication facility using simulation and RFID;Altaf;Autom. Constr.,2018
3. New offsite production and business models in construction: priorities for the future research agenda;Goulding;Archit. Eng. Des. Manag.,2015
Cited by
15 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献