Affiliation:
1. BPR, 4655 Wilfrid-Hamel Boulevard, Quebec City (QC), Canada, G1P 2J7
Abstract
After the construction of its wastewater treatment plants, the City of Quebec began to implement overflow control in wet weather to ultimately meet the effluent discharge objectives, i.e. no more than two overflows per summer season in the St. Lawrence River and no more than four in the St-Charles River. After several years of studies to determine which management strategies would best suit the purpose, and to propose optimum solutions, a first project to implement optimal and predictive management in real time, called « Pilot », came to life in 1999. Construction in phases soon followed and the work was completed in the fall of 2009. As a result, requirements with regard to environmental rejects were met in two sectors, namely the St-Charles River and the Jacques-Cartier Beach, and aquatic recreational activities could resume. Meanwhile, the City also worked at giving back access to the water courses to the public by developing sites at the Jacques-Cartier Beach and in the Bay of Beauport, and by rehabilitating the banks of the St-Charles River.
Subject
Water Science and Technology,Environmental Engineering
Cited by
18 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献