Improving Performance in Construction Projects: A Case Study of Malaysian Public Projects
-
Published:2021-10-08
Issue:4
Volume:29
Page:
-
ISSN:2231-8526
-
Container-title:Pertanika Journal of Science and Technology
-
language:en
-
Short-container-title:JST
Author:
Md Yusof Aminah,Khoso Ali Raza,Sohu Samiullah,Khahro Shabir Hussain,Chai Chang Saar
Abstract
Studies have worked out measures to curb the poor performance problems. However, it is hard to investigate the actual reasons because of the diverse construction culture of different countries. This research aims to develop a framework for mitigating the problems triggering the poor performance via a novel classification. An empirical analysis of mean and relative importance index (RII) was performed in SPSS of collected data from 56 public projects in Malaysia from 2003 to 2014. Qualitative and quantitative data was analysed from Audit General’s Reports, interviews, a pilot survey, and a full-scale experts’ survey. Findings from research investigated that the most influential factors affecting poor performance are not genuinely linked with those investigated from Audit General’s Report except a few. Furthermore, the study findings conclude that related financial problems and construction stage from project life cycle contribute to poor performance. The potential mitigation measures are worked out and validated via focused group discussions with experts. Finally, a framework was developed that emphasised Competent, Commitment, Communication, Comfort and Collaboration (5Cs) to mitigate the poor performance issues. The study is limited to identifying factors contributing to poor performance; however, relevant responsible stakeholders should also need to be identified in the future.
Publisher
Universiti Putra Malaysia
Subject
General Earth and Planetary Sciences,General Environmental Science
Reference46 articles.
1. Ahzahar, N., Karim, N. A., Hassan, S. H., & Eman, J. (2011). A study of contribution factors to building failures and defects in construction industry. Procedia Engineering, 20, 249-255. https://doi.org/10.1016/j.proeng.2011.11.162 2. Akhund, M. A., Khoso, A. R., Khan, J. S., Imad, H. U., & Memon, K. M. (2019). Prompting cost overrun factors during PCP in construction projects. Indian Journal of Science and Technology, 12(4), 1-7. https://doi.org/10.17485/ijst/2019/v12i4/140936 3. Akhund, M. A., Khoso, A. R., Memon, U., & Khahro, S. H. (2017). Time overrun in construction projects of developing countries. Imperial Journal of Interdisciplinary Research (IJIR), 3(4), 1-6. 4. Akhund, M. A., Imad, H. U., Memon, N. A., Siddiqui, F. H., Khoso, A. R., & Panhwar, A. A. (2018). Contributing factors of time overrun in public sector construction projects. Engineering, Technology & Applied Science Research, 8(5), 3369-3372. 5. Alaloul, W. S., Liew, M. S., Zawawi, N. A. W., Mohammed, B. S., Adamu, M., & Musharat, M. A. (2020). Structural equation modelling of construction project performance based on coordination factors. Cogent Engineering, 7(1), 1-20. https://doi.org/10.1080/23311916.2020.1726069
|
|