Unrelated parallel machine scheduling with machine processing cost

Author:

Safarzadeh Hamid,Niaki Seyed Taghi Akhavan

Abstract

In practical scheduling problems, some factors such as depreciation cost, green costs like the amount of energy consumption or carbon emission, other resources consumption, raw material cost, etc., are not explicitly related to the machine processing times. Most of these factors can be generally considered as machine costs. Considering the machine cost as another objective alongside the other classical time-driven decision objectives can be an attractive work in scheduling problems. However, this subject has not been discussed thoroughly in the literature for the case the machines have fixed processing costs. This paper investigates a general unrelated parallel machine scheduling problem with the machine processing cost. In this problem, it is assumed that processing a job on a machine incurs a particular cost in addition to processing time. The considered objectives are the makespan and the total cost, which are minimized simultaneously to obtain Pareto optimal solutions. The efficacy of the mathematical programming approach to solve the considered problem is evaluated rigorously in this paper. In this respect, a multiobjective solution procedure is proposed to generate a set of appropriate Pareto solutions for the decision-maker based on the mathematical programming approach. In this procedure, the ϵ-constraint method is first used to convert the bi-objective optimization problem into single-objective problems by transferring the makespan to the set of constraints. Then, the single-objective problems are solved using the CPLEX software. Moreover, some strategies are also used to reduce the solution time of the problem. At the end of the paper, comprehensive numerical experiments are conducted to evaluate the performance of the proposed multiobjective solution procedure. A vast range of problem sizes is selected for the test problems, up to 50 machines and 500 jobs. Furthermore, some rigorous analyses are performed to significantly restrict the patterns of generating processing time and cost parameters for the problem instances. The experimental results demonstrate the mathematical programming solution approach's efficacy in solving the problem. It is observed that even for large-scale problems, a diverse set of uniformly distributed Pareto solutions can be generated in a reasonable time with the gaps from the optimality less than 0.03 most of the time.

Publisher

Growing Science

Subject

Industrial and Manufacturing Engineering

Reference1 articles.

1. Unrelated parallel machine scheduling with machine processing cost;Safarzadeh;International Journal of Industrial Engineering Computations,2023

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Bio-inspired multi-objective algorithms applied on production scheduling problems;International Journal of Industrial Engineering Computations;2023

2. Unrelated parallel machine scheduling with machine processing cost;International Journal of Industrial Engineering Computations;2023

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3