Author:
Chiu Singa Wang,You Liang-Wei,Sung Peng-Cheng,Wang Yunsen
Subject
Industrial and Manufacturing Engineering
Cited by
6 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Minimizing operating expenditures for a manufacturing system featuring quality reassurances, probabilistic failures, overtime, and outsourcing;International Journal of Industrial Engineering Computations;2023
2. Coordinating Production and Delivery Schedule of Multi-Product and Multi-Customer through Mathematical Programming;Applied System Innovation;2022-06-22
3. The combined effect of rework, postponement, multiple shipments, and overtime producing common-component on a multiproduct vendor-client incorporated system;International Journal of Industrial Engineering Computations;2022
4. Optimizing an FPR-based supplier-retailer integrated problem with an outsourcer, rework, expedited rate, and probabilistic breakdown;International Journal of Industrial Engineering Computations;2022
5. Optimizing a multiproduct manufacturing system with delayed differentiation, outsourcing, expedited rate, and rework strategies;Journal of Applied Engineering Science;2021