Optimizing of Work Arc Furnace to Decopperisation of Flash Slag
Author:
Bydałek A.W.,Biernat S.,Wołczyński W.,Bydałek A.
Abstract
Abstract
Discusses an attempt to optimize the operation of an electric furnace slag to be decopperisation suspension of the internal recycling process for the production of copper. The paper presents a new method to recover copper from metallurgical slags in arc-resistance electric furnace. It involves the use of alternating current for a first period reduction, constant or pulsed DC in the final stage of processing. Even distribution of the electric field density in the final phase of melting caused to achieve an extremely low content of metallic copper in the slag phase. They achieved by including the economic effects by reducing the time reduction.
Publisher
Walter de Gruyter GmbH
Subject
Metals and Alloys,Industrial and Manufacturing Engineering
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献