Application Of The Work Breakdown Structure In Determining Cost Buffers In Construction Schedules

Author:

Połoński M.1

Affiliation:

1. 1 Faculty of Civil and Environmental Engineering, Warsaw University of Life Sciences, 02-776 Warszawa, ul. Nowoursynowska 159, Poland

Abstract

AbstractThe paper presents methods of determining the location of cost buffers and corresponding contingency costs in the CPM schedule based on its work breakdown structure. Application of correctly located cost buffers with appropriately established reserve costs is justified by the common overrunning of scheduled costs in construction projects. Interpolated cost buffers (CB) as separate tasks have been combined with relevant summary tasks by the start–to–start (SS) relationship, whereas the time of their execution has been dynamically connected with the time of accomplishment of particular summary tasks using the “paste connection” option. Besides cost buffers linked with the group of tasks assigned to summary tasks, a definition of the cost buffer for the entire project (PCB) has been proposed, i.e. as one initial task of the entire project. Contingency costs corresponding to these buffers, depending on the data that the planner has at his disposal, can be determined using different methods, but always depend on the costs of all tasks protected by each buffer. The paper presents an exemplary schedule for a facility and the method of determining locations and cost for buffers CB and PCB, as well as their influence on the course of the curve illustrating the budgeted cost of work scheduled (BCWS). The proposed solution has been adjusted and presented with consideration of the possibilities created by the scheduling software MS Project, though its general assumptions may be implemented with application of other similar specialist tools.

Publisher

Walter de Gruyter GmbH

Subject

Civil and Structural Engineering

Reference6 articles.

1. The analysis of the reliability of realization costs and investment s time limits in Warsaw Electronic Journal of Polish Agricultural Universities Topic Civil http www ejpau media pl volume issue art - html;Połoński;Engineering,2006

2. An investigation into the fundamentals of critical chain project scheduling International of Project;Steyn;Journal Management,2000

3. Planning instruments in construction management Technological and Economic Development of;Kapliński;Economy,2008

4. The effect of MS Project options on schedule update and EVM indicators calculation Scientific Review Engineering and Environmental in Polish;Połoński;Sciences,2012

5. Underestimating Costs in Public Works Error or Lie ? American Planning Association;Flyvbjerg;Journal,2002

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3