Best Fit of Cumulative Cost Curves at the Planning and Performed Stages of Construction Projects

Author:

Szóstak MariuszORCID

Abstract

The correct planning of investment costs and the effective monitoring of implementation process are significant problems in the management of investment projects. At the stage of construction works, it is worth determining the trend of the performed cost curve and periodically testing the fitting to the scheduled course of the budgeted cost curve. The aim of this research was to determine the shape and course of the cost curves for selected construction projects. A procedure was developed to forecast the distribution of cumulative costs at the planning stage of construction projects using envelopes (spaces) and cost curves for three different types of buildings and construction sectors: collective residential buildings, hotel buildings, and commercial and service buildings. An assessment of the actual costs incurred of investment tasks was carried out, the trend of which the cumulative cash flow curves can be estimated with a large match by forecasting the construction process. The article determines the best fit curves and the spaces of cost curves (the banana envelope of the S-curve) using mathematical formulas (third-degree polynomials), along with developed graphs for various construction projects. The analysis of the author’s own research was used to determine the best-fit curve and the curve’s area, which indicates the area of the correct planning of cumulative costs of construction investments.

Publisher

MDPI AG

Subject

Building and Construction,Civil and Structural Engineering,Architecture

Reference64 articles.

1. Study of factors causing cost and time overrun in construction projects;Gupta;Int. J. Eng. Res. Technol.,2020

2. Project cost estimation: Issues and the possible solutions;Amade;Int. J. Eng. Tech. Res.,2014

3. Kerzner, H. (2003). Project Management: A Systems Approach to Planning, Scheduling, and Controlling, John Wiley & Sons, Inc.

4. Cost estimation performance in the construction projects: A systematic review and future directions;Fazil;Int. J. Ind. Eng. Manag.,2021

5. Milat, M., Knezić, J., and Sedlar, J. (2021). Resilient Scheduling as a Response to Uncertainty in Construction Project. Appl. Sci., 11.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3