Affiliation:
1. University of Zilina, Faculty of Civil Engineering, Department of Geotechnics, Univerzitna 8215/1, 010 01 Zilina, Slovak Republic
Abstract
Abstract
In the case of realized geotechnical monitoring (GTM) of reinforced retaining wall in difficult geological conditions is demonstrated the important role at realisation of transport infrastructures, which are often realized in insufficient quality due to inappropriate geotechnical parameters from survey works or not fitted well design of structure at certain conditions. This can result in large deformations of structure, or losing stability or structure life-time is very limited and remediation work is complicated and expensive. There was built on the modernized railway line Bratislava – Trenčín, closed to Zlatovce, overpass and connected road embankments on the route of first class I/61. Structure was designed as a bridge over the railway track before the northern portal of the railway tunnel Turecký vrch was open. A part of the embankment and overpass was a retaining wall reinforced by geosynthetics. The results of the geotechnical monitoring of this wall were afterwards simulated using finite element method (FEM) and results of this comparison are the scope of this article.
Cited by
17 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献