1. Abdelkrim, M. – Bonnet, G. – de Buhan, P. (2003) A computational procedure for predicting the long term residual settlement of a platform induced by repeated traffic loading. Computers and Geotechnics, Vol. 30, No. 6, pp. 463-476. https://doi.org/10.1016/S0266-352X(03)00010-7
2. Adam, M. - Pflanz, G. – Schmid, G. (2000) Two- and three-dimensional modelling of half-space and train-track embankment under dynamic loading. Soil Dynamics and Earthquake Engineering, Vol. 19, pp. 559-573. https://doi.org/10.1016/S0267-7261(00)00068-3
3. Adamec, J. – Snahnican, J. (2016) Geotechnické konštrukcie na D1 Hričovské podhradie – Lietavská lúčka (Geotechnical structures on Hričovské podhradie – Lietavská lúčka D1 motorway). Engineering geology 2016, 16-17. June, 2016, Vysoke Tatry, Slovakia, pp. 24-31 [in Slovak].
4. Benz, M. (2007) Small-strain Stiffness of Soils and Its Numerical Consequences. Dissertation Thesis. Institute of Geotechnics, University of Stuttgart, 209 pp. Available at: https://www.igs.uni-stuttgart.de/dokumente/Mitteilungen/55_Benz.pdf, (accessed at 03/08/2021).
5. Dolinajova, K. – Snahnican, J. (2015) Oporné múry vystužené geomrežami a dvojzákrutovou oceľovou sieťou vystavené vysokému zaťaženiu v seizmickej oblasti (Geogrid and Double Twist Steel Mesh Reinforced Soil Walls Subjected to High Loads in a Seismic Area). Proceedings of the 12th Slovak Geotechnical Conference: 55 Years of Geotechnical Engineering in Slovakia, 1-2 June, 2015, Bratislava, Slovakia, pp. 79-87 [in Slovak].