Duration Prediction Models for Construction Projects in Middle East

Author:

El-Dash K. M. M.,Ramadan O. M. O.,Youssef W. M. M. A.

Abstract

Construction industry is one of the most influential motivators of a national economy. The success of construction projects is indispensable to sustain a robust economy. Completion time is important for construction projects, nevertheless project multifaceted objectives, sophisticated nature, inherent uncertainties, and risks are success impediments and can cause time overrun. Stochastic models and simulation scheduling techniques are developed to predict the risk and uncertainty effects on construction projects’ duration. The objective of this research is to develop models that predict the activity durations based on actual data from similar projects. The study introduces comprehensive statistical regression models using historical data of about 84,000 activities in Egypt, Kuwait, and Saudi Arabia. The activities encompass engineering, procurement and construction (EPC) activities for most disciplines of construction projects. The regression models can be utilized to predict more reliably the activities’ duration.

Publisher

Engineering, Technology & Applied Science Research

Reference38 articles.

1. A. Enshassi, J. Abu-Mosa, “Risk Management in Building Projects: Owners’ Perspective”, The Islamic University Journal (Series of Natural Studies and Engineering), Vol. 16, No. 1, pp. 95-123, 2008

2. F. Moavenzadeh, J. A. K. Rossow, The Construction Industry in Developing Countries, Massachusetts Institute of Technology, Technology Adaptation Program, 1975

3. W. Menesi, Construction Delay Analysis under Multiple Baseline Updates, MSc Thesis, University of Waterloo, 2007

4. K. C. Lyer, K. N. Jha, “Critical Factors Affecting Schedule Performance: Evidence from Indian construction Projects”, Journal of Construction Engineering and Management, Vol. 132, No. 8, pp. 871-881, 2006

5. I. A. Majid, Causes and Effects of Delays in Aceh Construction Industry, MSc Thesis, University Technology Malaysia, 2006

Cited by 9 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Influential Time and Cost Factors for Commercial Projects in the Malaysian Construction Industry;Engineering, Technology & Applied Science Research;2024-06-01

2. Critical Risk Factors influencing Time Schedule of Residential Projects in Pakistan;Engineering, Technology & Applied Science Research;2024-02-08

3. Machine Learning-Based Surrogate Models for Construction Project Duration Prediction;2024 14th International Conference on Cloud Computing, Data Science & Engineering (Confluence);2024-01-18

4. Construction Duration Forecasting Based on Machine Learning Method;ICCREM 2023;2023-11-30

5. Alternative Construction using BIM in Old Educational Buildings;Engineering, Technology & Applied Science Research;2023-04-02

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3