Critical Risk Factors influencing Time Schedule of Residential Projects in Pakistan

Author:

Sohu Samiullah,Kassim Tahara Ramadzan Binti Md.,Khan Omar Shahid

Abstract

Delays in residential construction projects are common issues in both developing and developed countries. This research aims to identify the key reasons behind these delays in Pakistan. When the projects run behind schedule, this can lead to problems such as exceeding the budget, reduced productivity at the construction site, and potentially lower quality work. The study involved a detailed survey using questionnaires that were addressed to industry professionals. Their responses were used to rank the critical factors causing delays. The most significant factors were found to be fluctuating material prices, financial challenges for contractors, underestimating project duration, poor site management, inexperienced contractors, ineffective project management, communication gaps among project stakeholders, shortage of skilled workers, changes in project design, unqualified contractors, and inadequate project planning. Identifying these critical factors through the Relative Importance Index (RII) method can help in addressing and preventing delays in Pakistan's construction projects, ensuring timely completion and better project outcomes in the future.

Publisher

Engineering, Technology & Applied Science Research

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3