Centralized versus decentralized construction project structure – Easing communication difficulties
Author:
Publisher
Informa UK Limited
Subject
Management of Technology and Innovation,Strategy and Management,Building and Construction
Link
http://www.tandfonline.com/doi/pdf/10.1080/15623599.2014.922726
Reference63 articles.
1. An AHP model for construction contractor prequalification
2. An Analytic Hierarchy Process for the Evaluation of Transport Policies to Reduce Climate Change Impacts
3. Knowledge as a Contingency Variable: Do the Characteristics of Knowledge Predict Organization Structure?
4. The Hierarchy of Authority in Organizations
5. Carnall C. 2007. Managing change in organizations. 5th ed. London: Prentice Hall.
Cited by 20 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. The moderating role of staff competency on communication and the effectiveness of force account approach: an empirical study from Tanzania;Cogent Social Sciences;2024-06-21
2. Unveiling the Impact of Communication Network on Engineering Project Team Performance: The Interplay of Centralization and Tie Strength;Psychology Research and Behavior Management;2024-04
3. An analysis of safety practices for small, medium, and large construction projects: A resilience engineering perspective;Safety Science;2024-01
4. Application of Fuzzy Logic and SNA Tools to Assessment of Communication Quality between Construction Project Participants;Sustainability;2023-03-23
5. Community engagement and sustainability: Two cases of implementation of mini-grids in Lesotho;Oxford Open Energy;2023
1.学者识别学者识别
2.学术分析学术分析
3.人才评估人才评估
"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370
www.globalauthorid.com
TOP
Copyright © 2019-2024 北京同舟云网络信息技术有限公司 京公网安备11010802033243号 京ICP备18003416号-3