Author:
Shilpa M.,Shivakumar M. R.,Hamritha S.,Phanden Rakesh Kumar,Gupta Amrit,Pushpak Abhishek
Publisher
Springer Nature Singapore
Reference20 articles.
1. Trojanowska J, Żywicki K, Varela MLR, Machado JM (2015) Shortening changeover time—an industrial study. In: 10th Iberian conference on information systems and technologies (CISTI), Aveiro, pp 1–6
2. Ferradás PG, Salonitis K (2013) Improving changeover time: a tailored SMED approach for welding Cells, CIRP 7:598–603
3. Desai MS (2011) Productivity enhancement by reducing setup time—SMED: case study in the automobile factory. Glob J Res Eng Mech Eng Mech Eng 12(5):37–42
4. Begović D, Misita M, Milanović DD, Milanović DD, Marija DL (2011) Industrial engineering methods in management of motor vehicle breakdowns behaviour analysis. FME Trans 39:191–194
5. Allahverdi A, Soroush HM (2008) The significance of reducing setup times/setup costs. Eup J Oper Res 187(2):978–984