Author:
Sharma Meenakshi,Sharma Manisha,Sharma Sameer,Kumar Amit
Reference22 articles.
1. S. Aggarwal, A. Gautam, D.K. Chauhan, L.M. Tiwari, S. Kapoor, A flow shop scheduling problem with transportation time and separated setup time of jobs. Procedia Eng. 38, 1327–1332 (2012)
2. A. Allahverdi, The third comprehensive survey on scheduling problems with setup times/costs. Eur. J. Oper. Res. 246, 345–378 (2015)
3. A. Allahverdi, Three-machine flowshop scheduling problem to minimize total completion time with bounded setup and processing times. Decis. Mak. Manuf. Serv. 1(1–2), 5–23 (2017)
4. A. Allahverdi, F. Al-Anzi, A branch-and-bound algorithm for three-machine flowshop scheduling problem to minimize total completion time with separate setup times. Eur. J. Oper. Res. 169, 767–780 (2006)
5. A. Allahverdi, Y.N. Sotskov, Two machine flowshop minimum length scheduling problem with random and bounded processing times. Int. Trans. Oper. Res. 10, 65–76 (2003)
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献