Author:
Mambwe Mwewa,Mwanaumo Erastus M.,Thwala Wellington Didibhuku,Aigbavboa Clinton O.
Publisher
Springer Nature Singapore
Reference65 articles.
1. Agumba, J. N. (2013). A construction health and safety performance improvement model for South African small and medium enterprises. Unpublished.
2. Ahmed, H., Edwards, D. J., Lai, J. H. K., Roberts, C., Debrah, C., Owusu-Manu, D.-G., & Thwala, W. D. (2021). Post occupancy evaluation of school refurbishment projects: Multiple case study in the UK. Buildings, 11, 169. https://doi.org/10.3390/buildings11040169
3. Aigbavboa, C. O. (2013). An integrated beneficiary centred housing satisfactory model for publicly funded housing schemes in South Africa.
4. Alomari, K. A., Gambatese, M. & Tymvios, N. (2018). Risk perception comparison among construction safety professionals: Delphi perspective. Journal of Construction Enginering Management, 144(12).
5. Ameyaw, E. E., & Chan, A. P. (2015). Evaluating key risk factors for PPP water projects in Ghana: A Delphi study. Journal of Facilities Management, 13(2), 133–155.