Author:
Neve Hasse H.,Wandahl Søren,Lerche Jon
Reference37 articles.
1. Alarcón LF (1993) Modeling waste and performance in construction. In: Proceedings of first annual conference of the international group for lean construction, pp 51–66
2. Ballard G (2000) The last planner system of production control. Ph.D. thesis, School of Civil Engineering, University of Birmingham
3. Byggeri D (2018) Konjukturanalyse [Economic Analysis]
4. Choy E, Ruwanpura JY (2006) Predicting construction productivity using situation-based simulation models. Can J Civ Eng 33(12):1585–1600
5. Christian J, Hachey D (1995) Effects of delay times on production rates in construction. J Constr Eng Manag 121(1):20–26
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献