Author:
Meier Christoph,Yassine Ali A.,Browning Tyson R.,Walter Ulrich
Publisher
Springer Science and Business Media LLC
Subject
Industrial and Manufacturing Engineering,Mechanical Engineering,Architecture,Civil and Structural Engineering
Reference68 articles.
1. Abdelsalam HME, Bao HP (2007) Re-sequencing of design processes with activity stochastic time and cost: an optimization-simulation approach. J Mech Des 129(2):150–157
2. Adler P, Mandelbaum A, Nguyen V, Schwerer E (1995) From project to process management: an empirically-based framework for analyzing product development time. Manag Sci 41(3):458–484
3. Baldwin AN, Austin S, Hassan TM, Thorpe A (1999) Modelling information flow during the conceptual and schematic stages of building design. Constr Manag Econ 17:155–167
4. Bean JC (1994) Genetic algorithms and random keys for sequencing and optimization. J Comput 6(2):154–160
5. Berthaut F, Pellerin R, Perrier N, Hajji A (2014) Time-cost trade-offs in resource-constraint project scheduling problems with overlapping modes. Int J Proj Organ Manag 6(3):215–236
Cited by
20 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献