Author:
Xu Xinrui,Yin Guangqiang,Wang Chunyu
Abstract
AbstractThis study addresses the multitasking scheduling problems with batch distribution and due date assignment (DDA). Compared with classical scheduling problems with due date-related optimization functions, the job due dates are decision variables rather than given parameters. The jobs completed are distributed in batches, and the sizes of all batches are identical, which may be bounded or unbounded. The jobs in every batch are scheduled one by one. Each batch incurs a fixed cost. Under multitasking environment, it allows the machine to put an uncompleted job on hold and turn to another uncompleted job. The goal is to identify the optimal primary job sequence, the optimal job due dates, and the optimal batch production and distribution strategy so that one of the following two optimization functions is minimised: the total cost composed of the earliness penalty, DDA cost, tardiness penalty and batch distribution cost, and the total cost composed of the earliness penalty, weighted number of late jobs, DDA cost and batch distribution cost. We devise efficient exact algorithms for the problems we consider, and perform numerical experiments to check how multitasking affects the scheduling cost or value, the results of which can assist decision-makers to justify the extent to put to use or refrain from multitasking.
Funder
National Natural Science Foundation of China
Outstanding Young Scientific and Technological Talents Foundation of Sichuan Province
Publisher
Springer Science and Business Media LLC
Subject
General Earth and Planetary Sciences,General Environmental Science
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献