1. Santero NJ, Horvath A (2009) Global warming potential of pavement. Environ Res Lett 4:1–8
2. Hand AJ, Galal KA, Ward DR, Fang C (2000) Cost-effectiveness of joint and crack sealing: synthesis of practice. J Transp Eng 126(6):521–529
3. Cuelho E, Freeman RB (2004) Cost-effectiveness of crack sealing materials and techniques for asphalt pavements (No. FHWA/MT-04-006/8127). Montana Department of Transportation, Research Program
4. Masson JF, Boudreau S, Girard C (2003) Guidelines for sealing and filling cracks in asphalt concrete pavement
5. Weiland C, Muench S (2010) Life cycle assessment of portland cement concrete interstate highway rehabilitation and replacement. Washington State Department of Transportation Research Report, p 105