Author:
Taheri Amiri Mohammad Javad,Haghighi FarshidReza,Eshtehardian Ehsan,Abessi Ozeair
Publisher
Springer Science and Business Media LLC
Subject
Civil and Structural Engineering
Reference44 articles.
1. Afrouzi, N. E., Roghanian, E., Najafi, A. A., and Mazinani., M. (2013). “A multi-mode resource-constrained discrete time-cost tradeoff problem solving using an adjusted fuzzy dominance genetic algorithm.” Scientia Iranica, Vol. 20, No. 3, pp. 931–44, DOI: 10.1016/j.scient.2012.12.024.
2. Alkass, S., Mazerolle, M., and Harris, F., (1996). “Construction delay analysis techniques.” Construction Management Economics., Vol. 14, No. 5, pp. 375–394, DOI: 10.1080/014461996373250.
3. Aminbakhsh, S. and Sonmez, R. (2016). “Discrete particle swarm optimization method for the large-scale discrete time-cost trade-off problem.” Expert Systems with Application, Vol. 51, pp. 177–185, DOI: 10.1016/j.eswa.2015.12.041.
4. Anagnostopoulos, K. P. and Kotsikas, L. (2010). “Experimental evaluation of simulated annealing algorithms for the time–cost trade-off problem.” Applied Mathematics and Computation, Vol. 217, No. 1, pp. 260–270, DOI: 10.1016/j.amc.2010.05.056.
5. Azaron, A., Perkgoz, C., and Sakawa, M. (2005). “A genetic algorithm approach for the time-cost trade-off in PERT networks.” Applied Mathematics and Computation, Vol. 168, No. 2, pp. 1317–1339, DOI: 10.1016/j.amc.2004.10.021.
Cited by
27 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献