Time Cost Trade-Off Problem Using Intuitionistic Fuzzy with Real Time Application in the Field of Construction

Author:

S Priyadharshini,G DeepaORCID

Abstract

In order to assist in locating the critical path in an acyclic network, the Critical Path Method (CPM) employs intuitionistic triangular fuzzy number. Project crashing is a technique used to cut the project timeline fast by minimizing the duration of one or more critical task below their typical duration. The goal of crashing, often referred to as the time-cost trade-off, is to shorten the project’s duration while lowering its cost. The intuitionistic fuzzy critical path technique and the time-cost trade-off issue were developed as a result of the uncertainty or ambiguity around the length of activities. The present investigation proposes an optimal method for handling the time-cost trade-off problem (TCTP). When the duration aspect is taken into account, the project’s overall cost is effectively reduced. It is simpler to compute the time and monetary expenses of being on the critical path while using this approach. An existing application from the literature is selected and implemented to demonstrate the operation of this technology. Additionally, we suggested a ranking method for defuzzification called “Magnitude measure”. Both the traditional approach and the path length ranking methodology are used for verification. MATLAB is used to give simulation results.

Publisher

Universal Wiser Publisher Pte. Ltd

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3