1. Abd El-Razek, M. E., Bassioni, H., and Abd El-Salam, W. (2007). “Investigation into the causes of claims in Egyptian building construction.” Proc. 23rd Annual Association of Researchers in Construction Management Conference (ARCOM), Belfast, UK, pp. 147–156.
2. Alkass, S., Mazerolle, M., and Harris, F. (1996). “Construction delay analysis techniques.” Journal of Construction management and economics, Vol. 14, No. 5, pp. 375–394, DOI: 10.1080/014461996373250 .
3. Al-Moumani, H. A. (2000). “Construction delay: A quantitative analysis.” International Journal of project Management, Vol. 18, No. 1, pp. 51–59, DOI: 10.1016/S0263-7863(98)00060-X .
4. Blake Dawson Waldron (2006). “Scope for improvement a survey of pressure points in Australian construction and infrastructure projects.” Australian Constructors Association, Sydney NSW, Australia.
5. Bunni, N.G. (2005). The FIDIC forms of contract, Wiley-Blackwell Publishing, Third Edition, UK.