Author:
Toğan Vedat,Eirgash M. Azim
Publisher
Springer Science and Business Media LLC
Subject
Civil and Structural Engineering
Reference34 articles.
1. Afshar, A., Ziaraty, A. K., Kaveh, A., and Sharifi, F. (2009). “Nondominated archiving multicolumn ant algorithm in time–cost trade-off optimization.” Journal Construction Engineering and Management, Vol. 135, No. 7, pp. 668–674, DOI: 10.1061/(ASCE)0733-9364 (2009)135:7(668).
2. Aminbakhsh, S. and Sönmez, R. (2016). “Applied discrete particle swarm optimization method for the large-scale discrete time–cost trade-off problem.” Expert System with Applications, Vol. 51, pp. 177–185, DOI: 10.1016/j.eswa.2015.12.041.
3. Ammar, M. A. (2011). “Optimization of project time-cost trade-off problem with discounted cash flows.” Journal of Construction Engineering and Management, Vol. 137, No. 1, 65–71, DOI: 10.1061/(ASCE)CO.1943-7862.0000256.
4. Azeez, M. N. and Alsaffar, A. (2014). “Construction time-cost optimization modelling using ant colony optimization.” Journal of Engineering, Vol. 20, No. 1, pp 1–18.
5. Azizipanah-Abarghooee, R., Niknam, T., Roosta, A., Malekpour, A. R., and Zare, M. (2012). “Probabilistic multiobjective wind-thermal economic emission dispatch based on point estimated method.” Energy, Vol. 37, No. 1, pp. 322–335, DOI: 10.1016/j.energy.2011.11.023.
Cited by
59 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献