1. Acaroglu, O., Ozdemir, L., and Asbury, B. (2008). “A fuzzy logic model to predict specific energy requirement for TBM performance prediction.” Tunnelling and Underground Space Technology, Vol. 23, No. 5, pp. 600–608, DOI: 10.1016/j.tust.2007.11.003 .
2. Chang, S. H., Choi, S. W., Bae, G. J., and Jeon, S. W. (2007). “A parametric study of rock properties and mechanical cutting conditions for deriving an optimum design model of a TBM cutter head equipped with disc cutters.” J. Korean Society Civil Eng., Vol. 27, No. 1, pp. 87–98 (in Korean).
3. Cho, J. W. (2010). Linear cutting test and numerical study on the assessment of rock cuttability of a TBM disc cutter, PhD Thesis, Seoul National University.
4. Cho, J. W., Jeon, S., Jeong, H. Y., and Chang, S. H. (2013). “Evaluation of cutting efficiency during TBM disc cutter excavation within a Korean granitic rock using linear-cutting-machine testing and photogrammetric measurement.” Tunnelling and Underground Space Technology, Vol. 35, pp. 37–54, DOI: 10.1016/j.tust.2012.08.006 .
5. Cho, J. W., Yu, S. H., Jeon, S. W., and Chang, S. H. (2008). “Numerical study on rock fragmentation by TBM disc cutter.” Tunneling Technology, Vol. 10, No. 2, pp. 139–152.