Publisher
Springer Science and Business Media LLC
Subject
Civil and Structural Engineering
Reference25 articles.
1. Ala-Risku T, Kärkkäinen M (2006) Material delivery problems in construction projects: A possible solution. International Journal of Production Economics 104:19–29, DOI: https://doi.org/10.1016/j.ijpe.2004.12.027
2. Behera P, Mohanty RP, Prakash A (2015) Understanding construction supply chain management. Production Planning & Control 26:1332–1350, DOI: https://doi.org/10.1080/09537287.2015.1045953
3. Bose S, Goswami A, Chaudhuri KS (1995) An EOQ model for deteriorating items with linear time-dependent demand rate and shortages under inflation and time discounting. Journal of the Operational Research Society 46:771–782, DOI: https://doi.org/10.1057/jors.1995.107
4. Eberhart R, Kennedy J (1995) A new optimizer using particle swarm theory. Proceedings of the sixth international symposium on micro machine and human science (MHS’95), October 4–6, Nagoya, Japan
5. Eberhart RC, Yuhui S (2001) Particle swarm optimization: Developments, applications and resources. Proceedings of the 2001 congress on evolutionary computation (IEEE Cat No01TH8546), May 27–30, Seoul, Korea, 81–86
Cited by
28 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献