Author:
Cao Shunze,Cui Jian,Fang Yong,Deng Ruyong
Publisher
Springer Science and Business Media LLC
Subject
Civil and Structural Engineering
Reference38 articles.
1. Ashraf, A. K. (2007). “Numerical modelling of face stability for TBM tunnelling.” Pro. of 33
rd
ITA-ALTES World Tunnel Congress, Prague, Czech Republic, DOI:
https://doi.org/10.1201/NOE0415408073.ch62
.
2. Attewell, P. B. and Woodman, J. P. (1982). “Predicting the dynamics of ground settlement and its derivatives caused by tunnelling in soil.” Ground Engineering, Vol. 15, No. 8, pp. 13–22.
3. Bakker, K. J., Boer, F. D., Admiraal, J. B. M., and Jaarsveld, E. P. V. (1999). “Monitoring pilot projects using bored tunnelling: the second heinenoord tunnel and the botlek rail tunnel.” Tunnelling and Underground Space Technology, Vol. 14, No. 2, pp. 121–129, DOI:
https://doi.org/10.1016/S0886-7798(99)00025-5
.
4. Blom, C. B. M., van der Horst, E. J., and Jovanovic, P. S. (1999). “Three-dimensional structural analyses of the shield-driven ‘green heart’ tunnel of the high-speed line south.” Tunnelling and Underground Space Technology, Vol. 14, No. 2, pp. 217–224, DOI:
https://doi.org/10.1016/S0886-7798(99)00035-8
.
5. Charahbagh, E. A., Mooney, M. A., Frank, G., Walter, B., and Diponio, M. A. (2013). “Periodic inspection of gauge cutter wear on EPB TBMs using cone penetration testing.” Tunneling and Undergrounding Space Technology, Vol. 38, pp. 279–286, DOI:
https://doi.org/10.1016/j.tust.2013.07.013
.
Cited by
14 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献