Author:
Lee Jae-Seung,Kim Yea-Sang
Publisher
Springer Science and Business Media LLC
Subject
Civil and Structural Engineering
Reference27 articles.
1. Bae, B. Y., Kim, K. R., Cha, H. S., and Shin, D. W. (2012). “To improve production process of the modular using the conveyor system.” Korean Journal of Construction Engineering and Management, Vol. 13, No. 5, pp. 103–112, DOI: 10.6106/kjcem.2012.13.5.103.
2. Choi, K. S. and Kim, H. J. (2014). “Analytical models of beam-column joints in a unit modular frame.” Journal of the Computational Structural Engineering Institute of Korea, Vol. 27, No. 6, pp. 663–672, DOI: 10.7734/COSEIK.2014.27.6.663.
3. Elinwa, A. and Buba, S. (1993). “Construction cost factors in nigeria.” Journal of Construction Engineering and Management, Vol. 119, No. 4, pp. 698–713, DOI: 10.1061/(ASCE)0733-9364(1993)119:4(698).
4. Hong, S. G. (2014). “Structural design guidelines for middle to high-rise modular buildings for architects and engineers.” Review of Architecture and Building Science, Vol. 58, No. 5, pp. 15–19.
5. Kim, B. Y. and Kim, Y. S. (2012). “The analysis of the major cost-increasing risk factors from the perspective of construction management-focusing on pre-construction phases.” Korean Journal of Construction Engineering and Management, Vol. 13, No. 2, pp. 147–155, DOI: 10.6106/kjcem.2012.13.2.147.
Cited by
55 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献