Deterministic and Probabilistic Risk Management Approaches in Construction Projects: A Systematic Literature Review and Comparative Analysis

Author:

Khodabakhshian Ania1,Puolitaival Taija2ORCID,Kestle Linda3

Affiliation:

1. Department of Architecture, Built Environment and Construction Engineering, Politecnico di Milano, Via Ponzio, 31, 20133 Milan, Italy

2. Faculty of Built Environment, Tampere University, FI-33014 Tampere, Finland

3. School of Building Construction, Unitec Institute of Technology, P.O. Box 92025, Auckland 1142, New Zealand

Abstract

Risks and uncertainties are inevitable in construction projects and can drastically change the expected outcome, negatively impacting the project’s success. However, risk management (RM) is still conducted in a manual, largely ineffective, and experience-based fashion, hindering automation and knowledge transfer in projects. The construction industry is benefitting from the recent Industry 4.0 revolution and the advancements in data science branches, such as artificial intelligence (AI), for the digitalization and optimization of processes. Data-driven methods, e.g., AI and machine learning algorithms, Bayesian inference, and fuzzy logic, are being widely explored as possible solutions to RM domain shortcomings. These methods use deterministic or probabilistic risk reasoning approaches, the first of which proposes a fixed predicted value, and the latter embraces the notion of uncertainty, causal dependencies, and inferences between variables affecting projects’ risk in the predicted value. This research used a systematic literature review method with the objective of investigating and comparatively analyzing the main deterministic and probabilistic methods applied to construction RM in respect of scope, primary applications, advantages, disadvantages, limitations, and proven accuracy. The findings established recommendations for optimum AI-based frameworks for different management levels—enterprise, project, and operational—for large or small data sets.

Publisher

MDPI AG

Subject

Building and Construction,Civil and Structural Engineering,Architecture

Reference142 articles.

1. Business Intelligence in Risk Management: Some Recent Progresses;Wu;Inf. Sci.,2014

2. Project Management Institute (PMI) (2017). A Guide to the Project Management Body of Knowledge (PMBOK Guide), Project Management Institute, Inc.. [6th ed.].

3. Li, J., Wang, J., Xu, N., Hu, Y., and Cui, C. (2018). Importance Degree Research of Safety Risk Management Processes of Urban Rail Transit Based on Text Mining Method. Information, 9.

4. Intelligent Manufacturing in the Context of Industry 4.0: A Review;Zhong;Engineering,2017

5. A Polynomial Neural Network Approach for Improving Risk Assessment and Industrial Safety;Aoyama;ICIC Express Lett.,2018

Cited by 5 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3