1. Beale, M. H., Hagan, M. T., and Demuth, H. B. (2016). Neural Network Toolbox™ user’s guide, Version R2016a, The MathWorks Inc., Natick, MA, USA.
2. Benardos, A. G. and Kaliampakos, D. C. (2004). “Modelling TBM performance with artificial neural networks.” Tunnelling and Underground Space Technology, Vol. 19, No. 6, pp. 597–605, DOI:
https://doi.org/10.1016/j.tust.2004.02.128
.
3. Buduma, N. and Locascio, N. (2017). Fundamentals of deep learning: Designing next-generation machine intelligence algorithms, O’Reilly Media, Sebastopol, CA, USA.
4. Chung, H., Lee, I. M., Jung, J. H., and Park, J. (2019). “Bayesian networks-based shield TBM risk management system: Methodology development and application.” KSCE Journal of Civil Engineering, Vol. 23, No. 1, pp. 452–465, DOI:
https://doi.org/10.1007/s12205-018-0912-y
.
5. Gholamnejad, J. and Tayarani, N. (2010). “Application of artificial neural networks to the prediction of tunnel boring machine penetration rate.” Mining Science and Technology, Vol. 20, No. 5, pp. 727–733, DOI:10.1016/S1674-5264(09)60271-4.